Dozens of bikers pushed aside concrete barricades to use the Sion rail overbridge on Thursday, which remained shut despite being inaugurated. An official said the bridge was inaugurated between 1 and 1:30 pm and was scheduled to be open to the public between 5 and 6 pm. However, people pushed the barricades to create an opening, letting bikes pass.