Residents of Worli have raised concerns over the delay in constructing a temporary footpath near the elevated connector linking part of Worli to Sewri and the Mumbai Trans Harbour Link (MTHL). With the 30-day deadline given to the contractor to construct a temporary footpath near the elevated connector that links part of Worli area to Sewri — and the Mumbai Trans Harbour Link (MTHL) set.