Mumbai Railway Vikas Corporation (MRVC) has introduced Prefabricated Vertical Drain technology between Dahisar and Mira Road to speed up the Borivali-Virar fifth and sixth railway line project. MRVC said the method can cut soil consolidation time from several years to around six months under suitable conditions. It helps strengthen soft soil for railway embankment construction.