he bridge linking Kisseman and Christian Village in Accra will be closed to traffic for six months from the second week of December to allow for its reconstruction and elevation under the Greater Accra Resilient and Integrated Development (GARID) Project. The works are intended to improve the flow of rainwater through the area and reduce the risk of flooding during periods of heavy rainfall.