Livemint. The closure has forced thousands of vehicles to use the roads below the elevated corridor, increasing traffic pressure around Sectors 61, 31 and. The 4.8-km elevated road first suffered damage on October 18 when a pothole appeared on the stretch. Initially, the Noida Authority got it repaired, but it reappeared at the same spot on October 20.