Why is the Mumbai-Goa highway delayed? Explore incomplete 8-km stretches, contractor controversies, and cost overruns stalling NH-66 project. The Missing Link is an eight-lane bypass that cuts travel time between Mumbai and Pune by around 30 minutes and reduces the distance by 6 kilometres. It includes two tunnels, one of 1.68 km.