Motorists travelling between South Mumbai and Pune could save up to 90 minutes with the new 7.35 km elevated road linking Atal Setu and the Mumbai-Pune Expressway, easing congestion around Panvel.. Pune Expressway connector reaches 67 pc completion. The 7.35-km elevated corridor aims to cut travel time by up to 90. The 7.35-km Atal Setu–Mumbai-Pune Expressway Connector has achieved 67% progress.