The configuration of the third stage was revisited comprehensively with respect to the design margins, raw material acceptance criteria, assembly procedures, and the quality checks that were followed so far. ISRO successfully conducted a ground static test of the PSLV third stage, detailing design margin enhancements, updated procedures, and planned follow-up tests.