The 7.35-km Atal Setu–Mumbai-Pune Expressway Connector has achieved 67% progress. The six-lane elevated corridor aims to reduce Mumbai-Pune travel time by 60-90 minutes, ease Panvel congestion and improve connectivity to Navi Mumbai Airport and JNPA. Mumbai: The 7.35-km, six-lane elevated corridor connecting Atal Setu (Mumbai Trans Harbour Link) with the Mumbai–Pune Expressway is 67% is ready.