Newly laid pedestrian pathways on Hyderabad’s Moosarambagh bridge have been dug up for cable work, leaving rubble and debris scattered across the walkway. Pedestrians have criticised the lack of coordination and demanded immediate clearance and restoration by the GHMC. Hyderabad: In a shocking display of apathy on part of the Greater Hyderabad Municipal Corporation (GHMC) officials and lack of inter-departmental coordination, the freshly laid Cement Concrete (CC) pedestrian pathways on the newly.